The IEPP® Super Atomized Dissolved Air Flotation is a new product of our company. Through our company's patented dissolved air technology, the saturated air can be dissolved in water within 0.6 seconds, which greatly improves the efficiency of sewage treatment equipment. At the same time, our patented release device can ensure the stable operation of the equipment without being clogged and reduce the cost of equipment maintenance.
Packing & Delivery
Company Profile
Our company integrates production, R&D and environmental scientific research. We are an excellent supplier of environmental protection equipment industry in China. The headquarter of the group is located in Jinan, Shandong province, and our factory is located in Yucheng, Shandong province.
Our company has a professional team with rich experience in environmental protection industry. Based on technological innovation,we provide customized services according to customer requirements.Our factory covers an area of about 15,000 square meters, with an investment of nearly 100 million yuan. The factory has modern production workshops, R&D centers,industrial laboratories which is equipped with advanced testing instruments. These ensure the sustainability of corporate development and the core competitive advantage of our products.
Our company's main products include: super atomization dissolved air flotation, sludge dehydrator, mud scraper, automatic dosing device, biological deodorization equipment , catalytic combustion device, etc. Among them, our self-developed super atomization dissolved air flotation has a remarkable effect in high-concentration wastewater treatment, and the SS removal rate can reach more than 85%, and this equipment has a number of national patents.
Our company is currently relying on its own advantages in the competition, has reached a strategic partnership with many
well-known brands, and the products have won unanimous praise from users.
FAQ
1.Q: Are you a factory or trading company?
A: We are a factory. we have rich experience for manufacturing sewage treatment equipment for
We can provide drawings according to your requirements.
more than 15 years.
2.Q: can you meet my special requirements for my products?
A: Yes, we have a professional design team.
3. Q: How to buy your products?
A: You can provide us your water sources, water quality,
flow rate and ground area (contact us for more details)
4. Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing,
50% balance before loading.
5. Q: What is the delivery time?
A: It depends on order quantities. Generally speaking the delivery time will be within 4 to 6 weeks.